Wednesday, April 14, 2010
Pouring the floor 2
The first 10 yards of concrete did one full bay and the first part of another. Jim estimated 25 yards for the entire pour.
Jim's son using a bull float.
This is Jim using a power trowel. Jim has all of the right equipment.
Power troweling while two people work the edges and around the tie down bolts.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment