Wednesday, April 14, 2010

Pouring the floor 2


The first 10 yards of concrete did one full bay and the first part of another. Jim estimated 25 yards for the entire pour.



Jim's son using a bull float.




This is Jim using a power trowel. Jim has all of the right equipment.





Power troweling while two people work the edges and around the tie down bolts.
Posted by Picasa

No comments:

Post a Comment