To my surprise, 3 concrete trucks showed up at the same time about 1:00. Dave the lead worker told me that we had 20+ cubic yards of concrete ordered for the pour.

It didn't take long to start with 20 yards to go. It was a very controlled pour with no rushing around. The mix was wetter than I imagined and Dave said it would make a better finish when they were done.

The inside of the form has a 2 inch styrophome spacer that will later be removed by me and there will be a brick ledge that the floor will sit on when it is poured. The worker here is holding the form up and they clamped a 2 X 4 on top of the form because it starts to float towards the top. Nothing holds this in place but the weight of the concrete.